Savings Example 1

A Commercial Development of a Six Storey Concrete Frame, Each Floor 1500 m2.

Costings

On a project which was originally designed in traditional cut and bent reinforcement, with a density of 145 kg/m3 and a 250mm thick slab, a Bamtec redesign could produce a reinforcement density of only 123kg/m3 (a saving of 15 %).

Accordingly, the original cut and bent requirement of 54.375t per floor is reduced by the Hy-Ten redesign to 46.125t of Bamtec & associated loose bar per floor.

Original Engineers
Rebar Intent
Bamtec Finate Element Solution
With Rebar Optimisation
Slab Weight (t) 145 KG/M3 123 KG/M3
Supply / Material Costs
Loose Bar @£600/t £32,625.00 £5,535.00*
Bamtec @£740/t *** N/A £27,306.00**
Total £32,625.00 £32,841.00
Fixing Costs
Loose Bar @£300 /t £16,312.50 £2,767.50*
Bamtec @£150 /t N/A £5,535.00**
Total £16,312.50 £8,302.50
Total Supply & Fixing Costs £48,937.50 £41,143.50
Total ‘All-in’ Saving Using Bamtec £7,794.00

* approx. 20% of slab weight

** approx. 80% of slab weight

*** assuming 10 /12mm bar & precast column (with no coupler requirement to columns)

Accessory Costs

If good quality high chairs and plastic spacer blocks (tric trac) are used to support Bamtec, we recommend they are placed at 800mm centres as opposed to the usual 1000mm centres. We make this recommendation because Bamtec carpets can weigh up to 1.7t.

This reduction in centres increases the cost of the highchairs and tric trac by 25%. So if the cost was originally say £1.50 per m2, it will be £1.88 per m2. Using the above example this will increase accessory costs by £570 per floor (£0.38 x 1500m2).

Total Saving

£7,224 per floor

£216 additional material costs (including premium for Bamtec) less £8,010 fixing cost saving + £570 accessory cost increase = net saving £7,224 per floor

This is before savings resulting from programme acceleration – our Bamtec customers report real savings in cycle time and it is not unusual to save a week per floor on a project like the above example.